When the frame under your deck is too far gone to patch, we tear it out, haul it away and build a new one on fresh footings.

It is your chance to change the size, the layout or the boards while you are at it.

Removal
Often $1,000–$3,000
New wood deck
About $25–$40 per sq ft
New composite deck
About $40–$60 per sq ft
On site
Usually one to three weeks
Broken, rotted wood boards with splintered ends against a green lawn (deck replacement example)

Deck Replacement in Alachua When the Frame Is Past Saving

Deck replacement is a full tear-out and rebuild. The old boards, railings, joists, beams and posts come off, the old footings come out or get abandoned, and a new deck goes up on a new frame. It costs more than a repair, though it also resets the clock: new lumber, new hardware and a structure built to the code in force today.

Plenty of homes around Alachua have decks built in the 1980s, 1990s and early 2000s. Many of those were framed with smaller footings, nailed ledgers and hardware that has now rusted for twenty or thirty years. When several of those problems show up at once, patching them one by one stops being good value, and a clean rebuild usually makes more sense.

Signs Your Alachua Deck Needs Replacing

  • Rot in many joists, or in the beams and posts that carry them, instead of in a few isolated spots
  • A ledger nailed to the house with no bolts and no flashing, with soft wood behind it
  • Footings that have sunk, tipped or were never more than blocks set on the ground
  • A deck that sways or bounces when people walk across it
  • Railings and stairs that would need to be rebuilt from scratch to meet current rules
  • Boards that are worn out across the whole surface, not only in a few places

One of these on its own is often a repair. Three or four together usually point to replacement. If you are not sure which group your deck falls in, our free deck framing inspection sorts it out, and our deck repair page explains what can be fixed piece by piece.

Deck floor framing showing evenly spaced wood joists running off a central beam (deck replacement example)

Deck Replacement Costs in Alachua, FL

A replacement deck is priced like a new deck plus demolition and haul-away. Removal often runs $1,000 to $3,000, depending on the size of the old deck, how high it sits, whether it has a roof or screen room attached and how far the debris has to be carried to the trailer. The new deck itself follows the same per-square-foot ranges as any new build.

ProjectTypical rangeWhat moves the price
Tear-out and haul-awayOften $1,000–$3,000Deck size and height, attached roof or screens, yard access
New pressure-treated wood deckAbout $25–$40 per sq ftSize, height, railings, stairs
New composite or Trex deckAbout $40–$60 per sq ftBoard line, color, railing style
Typical full replacement, woodRemoval plus $4,500–$12,000Footprint and stair runs
Typical full replacement, compositeRemoval plus $8,000–$22,000Footprint, picture-frame borders, lighting
PermitListed on your estimateIssuing office and project value

As a worked example, a 300-square-foot wood deck at $25 to $40 per square foot comes to about $7,500 to $12,000 for the new build, with removal added on top. Small decks run higher per square foot. The deck cost guide and our post on how much a deck costs in Alachua go deeper into the numbers.

Deck Tear-Out and Rebuild, Step by Step

  1. Measure and design. We record the old deck, then draw the new one with any changes you want in size, shape or height.
  2. Permit. We file drawings with the City of Alachua, Alachua County or your town's building office and wait for approval.
  3. Demolition. Boards, railings and framing come off in sections, nails and screws are picked up with a magnet, and the debris goes straight to the trailer.
  4. Ledger and house wall. With the old deck gone, we inspect the rim board and siding behind the ledger and repair any rot before new flashing goes on.
  5. Footings and frame. New footings are dug and poured, then posts, beams and joists go up with ground-contact lumber and new hardware.
  6. Decking, rails and stairs. The surface, guards and stairs go on, followed by the final inspection and a walkthrough with you.

Older decks may have been built with lumber treated with CCA, a preservative the EPA phased out of most residential use at the end of 2003. Treated wood should never be burned, so all of it goes to a proper disposal site. We do not leave piles of old lumber in your yard.

Replacement Decks Built to Today's Florida Building Code

A replacement deck has to meet the code in effect when it is permitted, which is often much stricter than the rules the old deck was built under. Ledgers get through-bolts and flashing instead of nails. Guards have to be at least 36 inches tall on most residential decks, with openings small enough that a 4-inch sphere cannot pass. Stairs need consistent rise and run and a graspable handrail.

Codes also no longer allow a ledger to hang on brick veneer, a detail that shows up on many ranch homes around Alachua. When the wall cannot take a ledger, we build a freestanding deck with its own beam and posts along the house. The International Code Council's guidance on attaching decks to houses explains why the ledger connection gets so much attention.

Deck Replacement, priced in writing.

Free on-site visit, an itemized estimate, and material options side by side.

Get a Free Estimate

Deck Replacement Around Screen Rooms, Siding and Landscaping

Tearing out a deck touches everything around it, so we plan for that up front. If an aluminum screen enclosure sits on the old deck, it has to come down first, and whether it can go back up depends on its condition and the new layout. If the siding behind the ledger is rotted, a few courses come off and get replaced before the new flashing goes on. Beds and shrubs next to the deck get marked so the crew keeps equipment and debris away from them.

Most families can still use the house normally during a replacement. The back door may be blocked for a few days between tear-out and the new framing, and we will tell you which days ahead of time. If you have pets, plan on keeping them inside or away from the work area while the old deck is coming apart, since loose nails and open footing holes are part of the job until the frame is up.

Timing matters too. Permit review takes time in every office we work with, so we usually schedule demolition after the permit is issued. That way you are not left without a deck while paperwork is still moving.

Inside a gated or HOA community, add architectural review to the front of that timeline. Most boards want a site plan, the deck dimensions and the board and railing colors before they approve a rebuild, even when the new deck sits in the same footprint as the old one. We put that package together for you along with the permit drawings.

Deck Replacement Is a Chance to Change the Layout

Since everything is coming out anyway, a replacement is the cheapest moment to make the deck bigger, lower, wider at the stairs or split into two levels. Many owners switch from wood to composite decking at this point to cut down on staining. Others plan the frame so a roof or screen room can go on later, and our page on screened porches shows what that looks like. For help choosing boards, read composite versus wood decks in North Florida.

We replace decks across the area, from older homes in Santa Fe Hills to country properties around LaCrosse. Start with our main page for deck builders in Alachua, or request a visit through the estimate form. Call or text us if you want to talk through the options first.

Deck Replacement Alachua FL Questions

Questions about deck replacement, answered.

Don’t see yours? Ask on the site visit, or call and we’ll talk it through.

How much does it cost to replace a deck in Alachua?

Expect the price of a new deck plus removal. Tearing out and hauling away the old deck often runs $1,000 to $3,000. The new deck then follows normal pricing: about $25 to $40 per square foot for pressure-treated wood and about $40 to $60 for composite. Stairs, railings, height and site access move the total most.

Can you reuse the old footings or framing?

Rarely. Old footings are often too small or too shallow for current rules, and reusing tired joists defeats the purpose of replacing the deck. If a section of framing is truly sound and the layout is staying the same, we will say so, though most replacements start from new footings for a frame that will last.

How long does a deck replacement take?

Tear-out usually takes a day or two. The new deck typically takes one to three weeks on site once the permit is approved, depending on size, height and how many stairs and levels are involved. You get the schedule in writing before work starts, and we keep the yard picked up each day.

Do I need a permit to replace a deck?

Yes. A replacement is treated like a new deck, so it needs a permit and inspections from the City of Alachua, Alachua County or your town's building office. The new deck must meet the current Florida Building Code. We prepare the drawings, file the application and handle each inspection.

Should I switch to composite when I replace my deck?

It is worth pricing. Composite costs more up front but does not need staining and resists rot and termites, which matters if you are replacing a deck that rotted. If you plan to stay in the home for many years, the lower upkeep often justifies it. We put wood and composite side by side on the estimate.

What happens to the old lumber?

We haul it all away. Older decks may contain CCA-treated wood, and no treated lumber should be burned, so it goes to an appropriate disposal site. Nails and screws are picked up with a magnet sweep. You end up with a clean yard and a new deck, with no leftover pile to deal with.

Replace Your Old Deck With One Built to Last

Let’s talk about your deck replacement.

We will measure the old deck, sketch the new one, and price wood and composite side by side, with removal on its own line.